Updates
Tamil Test
Tamil Test Plus See Plus plans
Login Start free

Type at least 2 letters.

National 2 min read

India Targets 100 GW Pumped Storage Hydropower by 2035-36

Save

Introduction

In a deeply structural and highly massive clean energy initiative, India has strictly and officially set a target to achieve 100 GW pumped storage hydropower capacity by 2035-36 to strengthen energy storage and grid stability.

Background

India's fierce absolute renewable energy transition requires massive absolute energy storage solutions. The fierce massive roadmap was completely absolutely prepared by the Central Electricity Authority (CEA) under the Ministry of Power to ensure grid stability during peak demand.

Why is this important?

This massive structural target is incredibly important because it directly and fiercely completely addresses the absolute massive need for reliable energy storage. Pumped storage uses two reservoirs at different elevations to store and generate electricity, heavily absolutely ensuring massive strict grid reliability during peak hours.

Key Highlights

  • The Target: Achieve massive absolute 100 GW pumped storage hydropower by 2035-36.
  • Current Capacity: About fierce absolute 7.2 GW operational and 11.6 GW under construction.
  • Roadmap By: Prepared by the Central Electricity Authority (CEA).

Government Actions

The massive absolute Ministry of Power is aggressively heavily structurally scaling up absolute massive clearances for new pumped storage projects to completely structurally ensure fierce massive achievement of this target.

Key Facts

  • Target: 100 GW by 2035-36.
  • Current total hydropower capacity: 56.3 GW.
  • Roadmap prepared by the CEA.

Impact

The strict massive absolute realization of this target will completely absolutely generate massive fierce grid stability. It will fiercely heavily completely reduce massive absolute strict dependence on fossil fuels and promote massive fierce absolute clean energy transition.

Exam Perspective

For Environment and Energy sections (UPSC, TNPSC), candidates must memorize the exact target (100 GW by 2035-36) and current capacity (7.2 GW operational).

Important Notes

  • Target: 100 GW pumped storage by 2035-36.
  • Roadmap by CEA under Ministry of Power.
  • Total hydro capacity currently: 56.3 GW.

Conclusion

India's fierce absolute 100 GW pumped storage target is a phenomenally powerful massive absolute structural triumph for clean energy planning, ensuring India's grid stability in the renewable era.