In November 2026, Bihar became the first Indian State to bring in a comprehensive Silt Management Policy. The Bihar Water Source Restoration and Silt Management Policy 2026, cleared on 15 September 2026, seeks to curb floods and revive rivers. It targets the Ganga, Kosi, Bagmati, Kamla-Balan and Gandak to boost their flow and carrying capacity. Silt, sand and sediment removed from the rivers are to be reused in National Highway building and other infrastructure; the Ministry of Road Transport and Highways said it would partner Bihar for this. The policy also backs waterbody restoration, though desilting must be done carefully to protect aquatic habitats and river ecosystems.